Complete execution for civil projects
The works are executed based on the technical project, execution details, approved documentation and contractual requirements.
The organization of resources, teams, and work stages is determined based on the complexity of the project, field conditions, and execution time.
The execution solutions are adapted to the function of the building, the designed structural system and the characteristics of the site.
Types of work performed
Services can be contracted for new works, interventions on existing constructions and exterior landscaping.
- new construction
- extensions and additions
- rehabilitation and modernization
- structural consolidations
- administrative buildings
- commercial buildings
- industrial and logistics spaces
- public service buildings
- annexes and technical constructions
- platforms, walkways and outdoor facilities
- punctual repair work
Works and execution stages
Construction site organization
Site preparation
Before structural works begin, the land is prepared according to the project. Operations may include clearing the land, removing the vegetation layer, demolishing existing elements, uncovering surfaces, tracing the construction, checking elevations, identifying underground networks, removing unsuitable materials, leveling the land, and creating access for machinery and materials.
Excavations and embankments
Foundation
Reinforced concrete elements
Resistance structures
Masonry and closures
Interior compartments
Rehabilitation and modernization
Organization of execution stages
The work process is determined by the project, location, and contractual requirements.
- analyzing the project and contractual requirements
- site assessment
- construction site organization
- layout of works
- carrying out excavations and embankments
- execution of foundations
- construction of the resistance structure
- execution of masonry and partitions
- waterproofing
- execution of exterior works and connections
- verification of the work performed
- remedying any non-conformities
- submission of the work and related documentation
QUALITY CONTROL
During the execution, all important elements are monitored for a compliant, functional construction adapted to the requirements of use.
OBJECTIVE OF THE EXECUTION
The objective is to achieve a construction that complies with the design, is functional and adapted to the requirements of use.